5
Facsimile
Transcription
October, 1920. THE CONCRETE AGE 5
LOOK HERE!
The demand for Ohio Concrete
Roofing Tile is greater than ever this
year. The man who is equipped to meet
this demand in his locality will control
a highly profitable and clean cut busi-
ness of his own.
A single 2 machine unit of Ohio Tile
Machines will manufacture all the reg-
ular and special shapes required for any
roof,—and with a net profit of over $5O
a day for you!
Write at once if you want informa-
tion.
CTki OHIO TILE
MACHINERY™
WILLOUGHBY, OHIO
(Near Cleveland)
SILO HARDWARE-
We are in a position at all tim.., to fur-
nish silo accessories of all descriptions for
any
make silo—we
carry a full and com-
plete stock on hand and can make imme-
diate delivery from our warehouse on car-
load or small shipments.
Our goods are made from the best ma-
terial obtainable—and are '-uaranteed.
Secure our inducements before placing
your orders. We aim to give satisfaction.
Prompt service and a
square deal assured
on all orders largo or small.
A trial order will convince you.
If you are just beginning to manufac-
ture or build silos—let us help you get
started right-—-we will be more than
pleased to aid you in any way possible.
SMITH SILO HARDWARE CO,
We can furnish
any quantity
SILO Rods
Lugs
Wood or Steel
Doors
Door Spreaders
Reinforcements
Reinforcing Steel,
Twisted or
Deformed
Galv. Iron Chutes
Metal Roofs
Cement Stave
Machines,
Moulds, Etc.
11th and Market Sts.
Des Moines, lowa
FOR SALE OR LEASE.
A complete concrete products plant, consist-
ing of two “Ideal’ ? block machines, 800
staple
post molds, mixer and conveyor, motor driven.
Switch track to build ng. Ten acres of aban-
doned cement tunnels with an even temperature
of 55 degrees Fah. the
year around, for curing
and storing. The plant is located on a one acre
plat in the wealthiest farming community in the
state. For particulars, address,
Portland Cement Products
Company,
Utica, Illinois.
Speed and low-cost in
building hollow walls—
vour bid low enough to get the business—high
enough to make good money—and the speed
gets you away to the next job in a hurry. That’s
how the Acme System works.
In building the one-story house (shown above) at
Phillipsburg, N. J., on the
Ingersoll-Rand property, 3
men erected all the form work in one day, and 5 men
poured the entire walls above grade in 9 hours, carrying
the concrete in buckets
up a ladder.
With this system, s'mple wood forms are built 12 ft.
high or higher. Ribs inside the airspace in the wall give
strength—they act as pilasters.
Write for full details and. explanation
of other Acme advantages.
Acme Hollow Wall Go., Madera, Calif.
Notes and Questions
Nobody has written a note for this page yet
Please sign in to write a note for this page