72

OverviewTranscribeVersionsHelp

Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

2 revisions
cpmorgan at Jun 05, 2020 04:25 PM

72

preliminary studies, one percent, preliminary studies, general drawings and specifications, two and one half percent.

Preliminary studies, general drawings, specifications and details, three and one half percent.

For dwelling or resident buildings and all work costing less than $5000 7 percent, divided as follows: for preliminary studies 1 1/2 percent, for preliminary studies, general drawings. Specifications, 4 percent, for preliminary studies, general drawings, specifications and detail drawings 5 percent

In the event of abandonment or indefinite suspension of work, the architect is entitled to the full percentage for his service and upon every duplicate of his work. He may, howevery, make special agreement in such cases with his client in settlement.

For monumental and decorative work and designs for furniture, a special rate in excess of the above.

For alterations and additions, an additional charge

72